Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :*/ 1) 10 PSI AIR TEST FROM METER ON EXISTING SYSTMEM TO (1) HANGING SPACE HEATER ON MAIN BLDG CENTER OF BACK OF STORE FROM ENTRY DOOR (ONLY) 2) GAS CARD AT METER |
|
| 01/15/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ PLEASE CHECK ENTIRE SYSTEM FOR APPROVED FITTINGS. 10 PSI TEST SHALL BE ON ENTIRE SYSTEM AT TIME OF NEXT INSPECTION. CONTRACTOR TO BE PRESENT AT TIME OF NEXT INSPECTION. | |
| 01/13/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ 1) 10 PSI PRESSURE TEST TO BE ON ENTIRE GAS SYSTEM. TWO WTR HTRS TO BE IN WEATHER PROOF ENCLOSURES. 2) GAS PIPING TO BE BONDED. 3) CONTRACTOR TO SUPPLY LADDER FOR ROOF ACCESS AT TIME OF NEXT INSPECTION. 4) ALL APPLIANCES TO HAVE APPROVED GAS VALVES WITHIN 3' OF APPLIANCE. | |
| 01/07/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* |