Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/07/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ 1) CORRECTIONS MADE OK. 2) PLBG CONTRACTOR ON SITE. 3) OK FOR GAS. 4) UCC LEFT AT METER. |
| 12/22/2003 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999* 1) GAS PRESSURE TEST TO BE 10psi OR MORE(DOWN BECAUSE OF COLD NIGHT). 2) GAS SUPPLY INTO FURANCE ROOM NEEDS TO BE SUPPORTED. 3) 1" MINIMUM CLEARANCE REQUIRED WHERE EXHUAST VENT GOES THROUGH ROOF. 4) ELECTRIC WATER HEATER INSTALLED WITHOUT PERMITS. A) NON LISTED FOR POTABLE WATER FLEXIBLE HOSE USED TO CONNECT HOT & COLD TOGETHER. THIS POSES A POSSIBLE LEAD CONTAMINATION RISK. B) IMPROPER DISCONNECT TO WATER HEATER. C) GAS CONNECTORS USED TO TIE IN HOT & COLD TO WATER HEATER. D) NO TPRV DISCHARGE INSTALLED. 5) A LIC CONTRACTOR IS REQUIRED TO MAKE CORRECTIONS. |