Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/14/2003 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ ALL CORRECTIONS MADE. |
| 11/12/2003 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) REPAIR 3/4" COUPLING LEAK |
| 11/10/2003 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) CONTRACTOR TO REPAIR LEAK AT 1-1/2 X 1 X 1-1/4 PVC TEE, 3/4" COUPLING CLOSE TO SERVICE IN DITCH. 2) CONTRACTOR TO PROVIDE SEPERATION BETWEEN 1" COPPER AND 3/4" COPPERS IN DITCH. 3) CONTRACTOR TO SEAL T&P PENETRATION THRU WALL. |
| 11/07/2003 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) T&P AT WATER HEATER TO GRAVITY DRAIN TO DAYLIGHT. 2) ALL HOSE BIBS TO HAVE VACUUM BREAKERS. 3) CONTRACTOR TO PROVIDE SEPERATION ON COPPER PIPING AT BUILD SERVICE LOCATION. LEAVE THIS LOCATION VISIBLE FOR NEXT INSPECTION. OK TO COVER ALL OTHER YARD WATER. |