Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T03PL01843

Parcel: 129020170

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
11/14/2003 PLUMBING - FINAL Approved IVRS - Inspection 0000*/ ALL CORRECTIONS MADE.
11/12/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) REPAIR 3/4" COUPLING LEAK
11/10/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) CONTRACTOR TO REPAIR LEAK AT 1-1/2 X 1 X 1-1/4 PVC TEE, 3/4" COUPLING CLOSE TO SERVICE IN DITCH. 2) CONTRACTOR TO PROVIDE SEPERATION BETWEEN 1" COPPER AND 3/4" COPPERS IN DITCH. 3) CONTRACTOR TO SEAL T&P PENETRATION THRU WALL.
11/07/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) T&P AT WATER HEATER TO GRAVITY DRAIN TO DAYLIGHT. 2) ALL HOSE BIBS TO HAVE VACUUM BREAKERS. 3) CONTRACTOR TO PROVIDE SEPERATION ON COPPER PIPING AT BUILD SERVICE LOCATION. LEAVE THIS LOCATION VISIBLE FOR NEXT INSPECTION. OK TO COVER ALL OTHER YARD WATER.