Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T03PL01803

Parcel: 114462100

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
11/24/2003 PLUMBING - FINAL Approved IVRS - Inspection 0000*/ CORRECTIONS HAVE BEEN MADE. CARD AT METER SET. CALL GAS CO. 889-1888
11/13/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ SEE ITEM #6 ON INSPECTION DATED 10/30/03 ALSO GAS PIPING TO BE SECURED USING APPROVED FASTENING DEVICES. ALL GAS VALVES TO BE CSA OR AGA APPROVED.
10/30/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) 10 PSI PRESSURE TEST COMPLETE GAS SYSTEM. 2) ALL ABOVE GROUND GAS PIPING SHALL BE MIN. 6" ABOVE FINISHED GRADE. 3) NO UNIONS SHALL BE ALLOWED IN LINE PIPING. 4) PLEASE PROVIDE WATER HEATER PERMIT. 5) WATER HEATER T&P SHALL GRAVITY DRAIN TO DAYLIGHT. 6) CONTRACTOR TO PROVIDE GAS ISOMETRIC FOR NEW GAS SYSTEM. 7) CONTRACTOR SHALL PROVIDE PROPER WATER HEATER VENT TERMINATION. 8) WATER HEATER SHALL HAVE UNIONS ON PIPING WITHIN 12" OF APPLIANCE.