Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
The login landing page when selecting 'View' is still occurring and is still pending further investigation.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/21/2003 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ APPEAL ON LOB - # 2003-105. CORRECTIONS HAVE BEEN MADE. |
| 10/31/2003 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) CONTRACTOR TO PROVIDE PETITION OF APPEAL FORM AT RESIDENCE FOR ALTERNATE FORM OF T&P RELIEF. 2) CONTRACTOR TO SEE SEC. 605.3 FULLWAY VALVE REQUIRED AT DISCHARGE SIDE OF EACH WATER METER. PER 94 UPC. |
| 10/30/2003 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) HOT AND COLD PIPING AT WASHING MACHINE MUST BE ISOLATED FROM EACH OTHER. 2) WATER HEATER T&P DRAIN MUST GRAVITY FLOW TO DAYLIGHT. 3) SEC. 605.1 WATER HEATER SHALL HAVE A FULL WAY VALVE ON DISCHARGE SIDE. 4) 10' OF COPPER IS REQUIRED AT SERVICE FOR PROPER GROUNDING OF ELECTRIC WITH GROUND CLAMP REATTACHED. |