Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 10/30/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
1) 10 PSI TEST FROM METER TO WATER HEATER, STOVE, WALL HEATER OK 2) GAS CARD DROPPED AT METER |
| 10/24/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) PLEASE PROVIDE 12" MINIMUM OF COVER FOR UNDERGROUND PIPING 2) PLEASE PROVIDE APPROVED FITTINGS (COUPLINGS) NOT THREAD PROTECTED 3) ALL GAS SYSTEM SHALL HOLD 10 PSI TEST WITH AIR 4) NO UNIONS SHALL BE USED, PROVIDE LOFT RIGHT NIPPLES AND COUPLINGS FOR IN LINE PIPING 5) ALL VALVES SHALL BE AGA OR CSA APPROVED 6) AFTER TESTING IS TIGHT, PRIME AND TAPE FITTINGS AND PIPE WHERE TOOL MARKS REMVOED PROTECTIVE COATING ON TITE UNDERGROUND PIPING 7) PROVIDE FLASHING WHERE PIPING PENETRATIONS ROOF |