Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/26/2003 |
PLUMBING - FINAL |
|
Approved |
1) GAS AND MECH. INSPECTIONS WERE CONDUCTED ON 11/21/03 BY RMYERS AND CWILLIAMS. GAS WAS APPROVED AND RELEASED. 2) PAPERWORK NOW PROCESSED. |
| 11/19/2003 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) GAS VALVE AT STOVE CORRECTED. 2) NO INSPECTION APPROVED FOR ROOF TOP UNIT AVAILABLE. WHAT ABOUT ALL THE OTHER UNITS ALREADY INSTALLED AND ALL THE GAS PIPING AND NEW WATER HTR THAT HAVN'T BEEN INSPECTED. PLEASE CORRECT YOUR PERMITTING AND ADDRESSING PROBLEMS AND HAVE ALL UNITS CURRENTLY INSTALLED INSPECTED. |
| 11/13/2003 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) SYSTEM REQUIRES 10 LB AIR TEST. 2) GAS VALVE MAY NOT BE PARTIALLY CONCEALED IN WALL AND MUST BE APPROVED TYPE (AT STOVE). 3) MAY NOT USE FLEX CONNECTOR ON T&P RELIEF. 4) GAS FLEX CONNECTOR EXCEEDS ALLOWABLE LENGTH. 5) PROVIDE WATER HEATER CLEARANCES AS DESCRIBED IN THE INSTALLATION MANUEL. 6) HAVE ROOF TOP GAS PACK INSPECTED AND APPROVED WITH PAPER WORK ON SITE BEFORE GAS WILL BE RELEASED. |