Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/02/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 01/29/2004 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) REQUIRED COMBUSTION RELIEF IN UPPER AND LOWER 12" OF ENCLOSURE. 2) SINGLE WALL VENT CONNECTOR REQUIRE 6" CLEARANCE FROM COMBUSTABLES. 3) EXTEND T&P RELIEF DRAIN WITH APPROVED MATERIALS. 4) PRESSURE TEST OK. |
| 11/14/2003 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) WATER HEATER REQUIRES AN ENCLOSURE. 2) GAS PIPING PENETRATING ROOF REQUIRES APPROVED FLASHING. 3) INSTALL ALL APPROVED VALVES AND FLEXES - DO NOT TEST THROUGH APPLIANCE. |