Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 10/15/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000*/ 10 PSI TEST IS OK. ALL CORRECTIONS HAVE BEEN MADE. LEFT GAS CARD |
| 10/13/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0999*/ 1) PROVIDE A DRAIN LINE ON T&P VALVE. 2) CRIMPED ENDS OF WATER HEATER VENT MUST GO WITH AIR FLOW. REPLACE ASBESTOS VENT WITH DOUBLE WALL PIPE. PROVIDE MIN. 3 SCREWS IN JOINTS OF VENT CONNECTOR. PROVIDE AN ENCLOSURE AROUND WATER HEATER. BE SURE TO HAVE MIN. 1" CLEARANCE FROM COMBUSTABLES ON DOUBLE WALL VENT. REMOVE UNION FROM GAS LINE ON ROOF AND USE REVERSE THREAD COUPLING AND NIPPLE. RETEST SYSTEM. RECALL FOR INSPECTION. |