Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 10/06/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000*/ 10 PSI GAS TEST OK FROM METER TO WATER HEATER AND FURNACE. |
| 10/03/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection 0000*/ 10 PSI TEST OK. |
| 10/01/2003 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0999*/ PLEASE PROVIDE ACCESS TO ALL GAS FIXTURES AT TIME OF NEXT INSPECTION. 1) ALL UNDERGROUND PIPING TO BE PRIMED AND WRAPPED. 2) NO UNIONS UNDERGROUND. NO THREAD PROTECTORS ALLOWED. 3) UNDERGROUND TEE TO BE TURNED UP AND CAPPED. 4) NO UNION SHALL BE USED AT BUILDING LOCATION WITHOUT AN AGA OR CSA VALVE INSTALLED PRIOR TO IT. 5) PLEASE PROVIDE AGA OR CSA GAS VALVE AT FURNACE. 6) WATER HEATER VENT TO HAVE 3 GALVANIZED SCREWS AT EACH JOINT CONNECTION WITH TAP COVERING SCREWS. 7) WATER HEATER VENT TO HAVE 1" CLEARANCE FROM DRYWALL. 8) PLEASE PROVIDE 10 PSI TEST UPON COMPLETION OF THESE ITEMS AND CALL FOR INSPECTION. 9) WATER HEATER T&P TO GRAVITY DRAIN TO DAYLIGHT. |