Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T03PL01317

Parcel: 135052860

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
08/25/2003 PLUMBING - GAS PRESSURE TEST Approved
08/21/2003 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection 0000*/1) OK TO BACKFILL TRENCH 2) MUST REMOVE UNION IN LINE AND REPLACE WITH RIGHT AND LEFT HAND NIPPLE OR LOCATE A AGA APPROVED SHUT OFF VALVE PRIOR TO UNION. 3) RE TEST SYSTEM. 4) WILL REQUIRE A VARIENCE FORM FOR T&P DRAIN ON SITE AT TIME OF INSPECTION. 5) REPLACE SHUT OFF VALVE TO RANGE. 6) MUST EXTEND WATER HTR FLU VENT 3' ABOVE FRESH AIR INLET.