Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 06/08/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :*/ ALL CORRECTIONS HAVE BEEN MADE, |
| 06/01/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
1) MUST REMOVE THREAD PROTECTOR COUPLING AND REPLACE WITH APPROVED BLK IRON COUPLINGS. 2) MUST APPLY APPROVED TAPE PRIMER ON ALL FITTINGS BELOW GROUND THEN APPLY 10 MIL TAPE. 3) MUST REMOVE UNION IN LINE AND USE RIGHT/LEFT HAND NIPPLE. 4) MUST REMOVE ½" SPRINKLER 90o AND REPLACE WITH APPROVED BLK STEEL MALABLE 90o. 5) MUST STRAP DOWN ½" GAS DROP AT FURNACE. 6) MUST INSTALL VENT CONNECTOR TO WTR HTR AND SCREW DOWN WITH 3 SHEET METAL SCREWS PER JOINT. 7) RETEST THE SYSTEM. |