Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/22/2003 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/1) CORRECTIONS MADE OK. OK FOR GAS. UCC LEFT AT METER. 2) PLEASE TRY AND MAINTAIN AT LEAST 12" OF COVER WHEN BACKFILLING. THANK YOU. / SW GAS 889-1888 |
| 08/18/2003 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/1) PLEASE READ NOTE #4 FROM 8/7/03, AND NOTE #1 FROM 8/8/03. 2) PLEASE READ NOTE # 2 FROM 8/7/03 AND NOTE #2 FROM 8/8/03. 3) CORRECT PRIMING AND TAPING IS ESSENTIAL ON GAS PIPING. 4) AN UNPROTECTED UNION IS NOT ALLOWED ON EXTERIOR WALL. |
| 08/08/2003 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999* |
| 08/07/2003 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) NEED TO TEST ENTIRE SYSTEM TO 10 POUNDS 2) WHERE UNIONS ARE NECESSARY A RIGHT - LEFT NIPPLE AND COUPLING SHALL BE USED. 3) MINIMUM 12" OF COVER REQUIRED DEPTH. 4) ALL JOINTS AND MARRED COATING TO BE PRIMED AND TAPED. |