Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
| Date |
Description |
Inspector |
Results |
Comments |
| 09/22/2003 |
PLUMBING - PROGRESS |
|
Approved |
IVRS - Inspection 0000* |
| 09/04/2003 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) TYPE "K" BRANCH PIPING FOR HOUSE SUPPLY AND FIRE PROTECTION INSTALLED OK-OK TO COVER |
| 09/03/2003 |
PLUMBING - PROGRESS |
|
Denied |
IVRS - Inspection 0999*/ 1) REMOVE AND REPLACE ALL DINGED, KINKED OR FLATTENED BY BENDING, SECTIONS OF COPPER 2) PLEASE TRY AND INSTALL IN A WORKMANSHIP LIKE MANNER |
| 08/29/2003 |
PLUMBING - PROGRESS |
|
Denied |
IVRS - Inspection 0999* |
| 08/29/2003 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000* |
| 08/28/2003 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*/1) REVIEWED CHANGE OF MATERIAL TYPE ON WATER SERVICE FROM PE TO TYPE K COPPER. |
| 08/20/2003 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*/1) 6" PVC WATER LINE, THRUST BLOCKS AND PIPING OK. SUBJECT TO PRESSURE TEST, OK TO COVER. |
| 08/19/2003 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000* |
| 08/13/2003 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*/1) RECEIVED COPIES OF VACUUM TEST ON MANHOLES AND SEWER SCHEDULE FROM ENGINEER ON SEWER GRADE. 2) REVIEWED SPECS. FOR WATER LINE WITH CONTRACTORS. |
| 08/08/2003 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) AIR TEST FROM MH #1 AND #2-OK 2) 6" FROM MH #6 TO DEAD END-OK 3) ALL SECTIONS HIGLIGHTED ON PLAN-OK TO COVER 4) NEED VERIFICATION OF GRADE 5) MANHOLE TEST 6) ALL WATER PIPING |
| 08/07/2003 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*/ TEST BETWEEN #3 & #4 OK. INSTALLATION OF TEE FITTINGS ON SECTION BETWEEN MANHOLE #6 & #5 PER PCWNM AND APPROVED PER NOEL ORTIZ OK. WILL REQUIRE VERIFICATION OF GRADE ON FINAL. NEED TEST ON MANHOLES. |
| 08/06/2003 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) 5# AIR TEST BETWEEN MH 5 & 6 OK. 5# AIR TEST BETWEEN MH 4 & 5 OK. 2) SEWER MAIN AS HIGHLIGHTED ON PLAN OK. MH #1 TO #2 OK. MH #2 TO #3 OK. 3) BRANCHES AS HIGHLIGHTED ON PLAN. OK TO COVER. |
| 08/05/2003 |
PLUMBING - PROGRESS |
|
Denied |
IVRS - Inspection 0999*/ GATE LOCKED - NO ACCESS. |
| 07/31/2003 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) 8" PVC MAIN, BETWEEN MAN HOLES #6 AND #5, BETWEEN #5 AND #4. FROM #4 OVER TO #3 BUT #3 BASE IS NOT SET PIPING BETWEEN #2 AND #3 OK-NEED TO SEE TASES, AND TEST ON EVERYTHING 2) SANITARY SEWER NOTE #18 APPROVES INSTALLATION PER PCWWM STDS AND DETAILS 3) OK TO COVER PENDING VERIFICATION OF GRADE AND APPROVAL OF BRANCH PIPING CONNECTIONS 4) BRANCHES HIGHLIGHTED ON PLAN OK TO COVER |
| 07/30/2003 |
PLUMBING - PROGRESS |
|
Not ready for Inspection |
|