Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T03PL01115

Parcel: 135022160

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
08/20/2003 PLUMBING - FINAL Approved IVRS - Inspection 0000*/1) SOIL WATER TEST IS OK. 2) HCS CONNECTION IS OK. 3) OK TO BACKFILL TRENCH.
08/19/2003 PLUMBING - FINAL Denied IVRS - Inspection 0999*/ 1) MUST USE DIRECTIONAL FITTINGS FOR TWO WAY C.O. 2) MUST SHADE ENTIRE TRENCH TO TOP OF PIPE. 3) CAN NOT HAVE A FITTINGS IN A REVERSED POSITION. 4) RE TEST SYSTEM.