Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/31/2003 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ 10 PSI TEST IS OK FROM METER TO WALL FURNACE AND STOVE AND WATER HEATER. ALL CORRECTIONS MADE. GAS CARD DROPPED AT METER. |
| 10/17/2003 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) NO UNION SHALL BE ALLOWED IN GAS LINE AT METER LOCATION OR AT WATER HEATER LOCATION. 2) 10 PSI TEST SHALL HOLD FOR 15 MIN. 3) GAS PIPELINE SHALL BE 6" MIN. ABOVE FINISHED GRADE. 4) WATER HEATER MUST HAVE VENT THRU ROOF WITH APPROVED CAP. 5) PLEASE PROVIDE AGA OR CSA APPROVED GAS VALVE AT STOVE AND WATER HEATER AND FURNACE. 6) PLEASE PROVIDE PERMIT FOR NEW WATER HEATER. 7) TERMINATE T&P WITHIN 6" OF FINISHED GRADE. |