Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000* | |
| 05/21/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*1.) GAS PRESSURE TEST WAS BELOW 10LBS 2.) WTER HTR FLU VENT MUST BE SCREWED DOWN @ APPLIANCE COLLAR AND CHECK ALL JOINTS. 3.) OPEN PANELS FOR POOL HTR BOILER TO VERIFY P & T VALVE. 4.) WATER HTR P & T DRAIN CAN NOT GO UP THRU ROOF. UNLESS THIS APPLICATION WAS PREVIOUSLY INSPECTED. MUST PROVIDE INSPECTION REPORT OR VARIANCE FORM @ TIME OF INSPECTION. 5.) WHY ARE THERE TEES ON ROOF WITH PLUGS. IF THESE ARE NOT FOR FUTURE USE THEN THEY MUST BE REMOVED. 6.) MUST STRAP DOWN 1/2" DROP FOR DRYER. |