Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/08/2003 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ 1) SAFETY CORRECTIONS ON NON-AFFECTED SIDE MADE-OK 2) CORRECTIONS ON THIS PERMIT MADE OK 3) OK FOR GAS 4) UCC LEFT AT METER |
| 06/16/2003 |
PLUMBING - FINAL |
|
Denied |
1) NO TEST ON SYSTEM 2) DO NOT CALL FOR INSPECTION UNTIL ALL THE CORRECTIONS HAVE BEEN MADE-ALL THE NEW WATER HEATERS INSPECTED AND APPROVED AND THE ENTIRE GAS LINE IS UNDER TEST 3) FAILURE TO COMPLY COULD RESULT IN VIOLATIONS, PENALTIES, REINSPECTION FEES AND DOUBLE PERMIT FEES |
| 05/29/2003 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) GAS PRESSURE TEST ARE TO USE GUAGES IN 1/10 POUND INCREMENTATION OR LESS 2) THIS INSPECTION GOES BEYOND A SIMPLE RECONNECT. SAFETY AND CODE VIOLATIONS ARE TO NUMEROUS TO LIST. HIGH LIGHTS WATER HEATER, NO T&P DRAIN, EXPOSED TO ELEMENTS, NO PAD, INADEQUATE VENTING, NON APPROVED GAS VALVE AND ALL NEW WATER HEATER INSTALLATIONS REQUIRE PERMITS 3) GAS PIPING: UNPROTECTED UNIONS NOT ALLOWED READ 12110.10 94WPL UNIONS. REVIEW TABLE 3-1 HANGERS AND SUPOORTS FOR GAS PIPING. THE ENTIRE SYSTEM MUST BE TESTED, APPROVED VALVES |