Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/17/2003 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ 1) CORRECTIONS MADE OK. OK FOR GAS. 2) UCC LEFT AT METER. S.W. GAS 889-1888 |
| 05/29/2003 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) SCHEDULE 40 PVC YARD WATER FROM METER TO HOUSE CONNECTION-OK PRESSURE TEST OK OK TO COVER 2) PE GAS WITH ONE PIECE TRANSITION RISERS AND TRACER WIRE-OK PRESSURE TEST OK, OK TO BACKFILL 3) ALL HOSE BIBS REQUIRE VACCUM BREAKERS 4) RECONNECT GAS FIXED NEUTER HEATER 5) INSTALL VALVE BEFORE UNION |