Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2003 | PLUMBING - FINAL | Not ready for Inspection | 1.) HAVE GAS PACKS INSPECTED AND APPROVED BEFORE CALLING GAS FINAL. 2.) CAP OR PLUG ALL UNUSED GAS PIPING. 3.) HOSE BIBBS REQUIRE VACCUUM BREAKERS 4.) SECURE PERMIT FOR NEW ELECTRIC WATER HEATER. 5.) ALL VALVES TO BE AGA OR CSA APPROVED. |
|
| 04/21/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999* 13 PSI TEST IS OK 1.) OBTAIN NECESSARY MECHANICAL PERMITS FOR 2 NEW GAS PACKS. 2.) PROVIDE AGA APPROVED VALVE AT APPLIANCES 3.) USE DOUBLE WALL VENT PIPE ON WATER HEATER PROVIDE MIN. 1" CLEARANCE. 4.) PROVIDE T & P DRAIN LINES ON WATER HEATERS. 5.) PROVIDE HIGH COMBUSTION AIR LOWVER IN WATER HEATER ENCLOSURE. WILL LEAVE GAS CARD ON NEXT INSPECTION. |