Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2003 | PLUMBING - SEWER HCS CONNECT | Approved | IVRS - Inspection 0000* | |
| 11/04/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*/ FINAL CONNECTIONS TO UNITS 2 & 4 ARE OK. | |
| 10/15/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*/ FINAL CONNECTION OF BLDG DRAINS TO BLDG SEWER FOR UNITS 1,10,22,23,25,26,27,28,29,30,31,32,33, AND 34 ARE OK. | |
| 09/12/2003 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection 0000* | |
| 09/11/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | 1) FINAL CONNECTIONS OF BLDG DRAINS TO BLDG SEWER IS OK FOR UNITS # 11,13,16,17,18,19,20,24, IS OK. | |
| 09/10/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*/ 1) FINAL CONNECTION TO UNIT 22 IS OK | |
| 09/09/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*/1) FINAL CONNECTION OF BLDG SEWER TO BLDG DRAIN UNIT #21 IS OK. | |
| 09/08/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*/ 1) SOIL WATER TEST AND FINAL CONNECTIONS TO BLDG. SEWER IS OK FOR UNITS #6,7,8,9,12, 14 AND 15 | |
| 09/03/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*/ 1) SOIL WATER TEST FOR UNIT #11 AND 17 IS OK 2) UNIT #23 HAS LEAK AT WAX RING MUST REPLACE AND RETEST | |
| 08/29/2003 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection 0000*/ NOT READY FOR INSPECTION. | |
| 08/26/2003 | PLUMBING - SEWER HCS CONNECT | Denied | IVRS - Inspection 0999*/1) MUST PROVIDE WATER TEST FOR 4 UNITS AT A TIME AS REQUESTED. | |
| 08/22/2003 | PLUMBING - SEWER HCS CONNECT | Denied | IVRS - Inspection 0999*/1) MUST USE DIRECTIONAL FITTINGS ON WASTE SYSTEM. | |
| 08/21/2003 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection 0000* | |
| 08/19/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*/1) PLBG CONTRACTOR AND I HAD A WALK THRU CHECKING EACH UNIT FOR EXISTING WASTE LINES UNDER TRAILERS. | |
| 08/08/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*/ 1) SOIL WATER TEST IS-OK 2) THIS INSPECTIONS IS FOR 6" SEWER MAIN FROM UNIT 21 WEST TO 18 IS OK 3) BRANCH LINES TO ALL UNITS IS OK 4) OK TO BACKFILL TRENCHES | |
| 08/04/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*/ 1) SOIL WATER TEST IS OK. 2) THIS INSPECTION IS FOR 6" FROM UNIT #29 WEST TO 21 DUE TO SEWER LINE FLOATED CAUSED BY RAIN. | |
| 07/29/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000* | |
| 07/28/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*/ 1) SOIL WATER TEST IS OK 2) THIS INSPECTION IS FOR 6" SITE SEWER FROM UNIT #29 WEST TO UNIT #21 IS OK | |
| 07/18/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*/ 1) SOIL WATER TEST IS OK 2) THIS INSPECTION IS FOR 6" MAIN UP TO UNIT #29 CLEANOUT 3) OK TO BACKFILL TRENCH | |
| 07/14/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*/ 1) SOIL WATER TEST IS OK 2) THIS INSPECTION IS FOR 6" SEWER MAIN FROM P.L. TO UNIT #31 IS OK 3) OK TO BACKFILL TRENCH | |
| 07/10/2003 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection 0000* | |
| 06/19/2003 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection 0000* 1) HAD PRE CONSTRUCTION MEETING WITH UTILITY CONTRACTOR | |
| 05/16/2003 | PLUMBING - SEWER HCS CONNECT | Denied | IVRS - Inspection 0999*WILL REQUIRE A CERTIFIED SURVEYOR TO VERIFY GRADE EVERY 50'. 2.) NO APPROVED DRAWING ON SITE AS REQUESTED. |
|
| 05/15/2003 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection 0000*NOT READY FOR INSPECTION. | |
| 05/14/2003 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection 0000*SOIL WATER TEST IS OK UP TO UNIT #25 ONLY. 2.) REPLACE 6" GRADE C.O. @ UNIT 29. 3.) OK TO BACKFILL TRENCH. 4.) WILL REQUIRE WATER TEST ON ALL BRANCHES. |
|
| 05/12/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*NOT READY FOR INSPECTION. | |
| 05/07/2003 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection 0000*SOIL WATER TEST IS OK FROM M.H. TO WEST TO UNIT #1" 35,34 ONLY. 2.) MUST HAVE DRAWING APPROVED BY CITY PLAN CHECKER ASAP. 3.) OK TO BACKFILL TRENCH UP TO UNIT 34 ONLY. |
|
| 04/12/2003 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection 0000*HAD PRE CONSTRUCTION MEETING WITH PLBG. CONTRACTOR ON SITE SEWER. 2.) WILL REQUIRE A SEALED ENGINEERED & APPROVAL DRAWING FOR SITE SEWER AND CONNECTION TO COUNTY SEWER MAIN PRIOR TO INSPECTION. 3.) SITE WATER & GAS DISTRIBUTION WILL REQUIRE A APPROVED DRAWING AS WELL. |