Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000* 1.) THE TIME TO UP GRADE COMPONENTS OF THE WATER HEATER IS WHEN THE WATER HEATER IS REPLACED; BUT SINCE YOU INSTALLED A PAN AND A PRESSURE RELIEF VALVE (WHICH REQUIRES A PETITION OF APPEAL") BE SURE AND INSTALL A VACCUM BREAKER ON THE NEW HOSE BIBB. NOTE A LOST OF WATER IS LEAKING AROUND THE FOUNDATION. 2.) PRESSURE TEST OK PIPING OK VALVES AND FLEXES OK 3.) OK FOR GAS UCC LEFT AT METER. SW GAS 889-1888. |