| 03/14/2003 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection 0000*GAS PRESSURE TEST IS OK 2.) NOTE: THIS INSPECTION IS FOR NEW 1" GASS LINE FROM EXISTING BLDG. SERVICE TO RELOCATION OF GAS METER TO ALLEY ONLY. 3.) EXSISTING GAS SYSTEM IS STILL ENERGIZED. 4.) OK TO BACKFILL TRENCH. |
|
| 03/11/2003 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection 0999*1.) PROVIDE A DRAWING OF GAS SYSTEM WITH BTU DEMAND TOTAL LENGTH, & CORRECT SIZING FOR TOTAL DEMAND. 2.) EXPOSE ALL NEW PIPE BURIED UNDERGROUND. DO NOT PRIMER & TAPE MORE THAN 12" OF PIPE UNDERGROUND. MUST USE SCOTCH COAT PIPE. 3.) PROVIDE A PERMIT FOR NEW WATER HEATER & PROVIDE A T & P DRAIN LINE. BE SURE ALL GAS SHUT OFF VALVES ARE AGA OR CSA APPROVED. BE SURE ALL GAS APPLIANCE ARE UP TO CODE. RECALL FOR INSPECTION. |