Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T03PL00402

Parcel: 132090010

Inspection Status: Denied

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
03/27/2003 PLUMBING - FINAL Denied IVRS - Inspection 0999*
03/27/2003 PLUMBING - FINAL Approved 1) SEE NOTE #1 AS REQUESTED TO PROVIDE TEST ON SYSTEM AND BRING SYSTEM TO CODE
03/20/2003 PLUMBING - FINAL Denied IVRS - Inspection 0999*1.) MUST HAVE A LICENSE PLBG. CONTRACTOR DO TEST & WORK ON ALL RENTAL PROPERTYS GAS SYSTEM AS REQUESTED.
2.) MUST PAY REINSPECTION FEE BEFORE THE NEXT INSPECTION.
03/13/2003 PLUMBING - FINAL Denied IVRS - Inspection 0999*
1.) SEE SECTION: 507.3.1. 94 UPC ON COMBUSTION AIR FOR WATER HTR.
2.) SEE SECTION: 517.6 94 UPC FOR WATER HTR FLU VENT TERMINATION.
3.) MUST INSTALL 90 FOR P & T DRAIN.
4.) MUST HAVE AIR PRESSURE TEST UP @ 10LBS MIN @ TIME OF INSPECTION.
5.) SEE NOTE FROM PREVIOUS INSPECTION.
03/06/2003 PLUMBING - FINAL Denied IVRS - Inspection 0999*ON RENTAL PROPERTY A LICENSE PLBG.
CONTRACTOR MUST PROVIDE PRESSURE TEST AND BRING GAS SYSTEM UP TO CODE IF NEEDED.