Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*TEST ON GAS LINE IN TRENCH IS OK OK TO BACKFILL TRENCH. OK TO ENERGIZE PIPE IN TRENCH & PIPING WITHIN THE STRUCTURE. LEFT GAS CARD. |
|
| 02/12/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999* 1.) PROVIDE TAPE PRIMER ON TAPED JOINTS. 2.) PROVIDE A TEST ON ALL EXISTING GAS PIPE. 3.) PROVIDE HIGH & LOW COMBUSTION AIR OPENINGS TO WATER HEATER ENCLOSURE. 4.) PROVIDE RISERS AT BOTH ENDS OF GAS PIPE. GAS SHUT OFF VALVES ARE OK. RECALL FOR INSPECTION. |