Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/17/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :*/APPROVED-25PSI AIR TEST FORM MOTER NOW 1" SCOTCH COAT UNDER GROUND TO BUILDING TO DRYER LOCATION, STOVE, FURANCE & WATER HEATER 03090-NOT READY 1) PROVIDE BONDING OF BUILDING GAS PIPING. 2) INSTALL WATER HEATER, PROVIDE CITY SIGHED POTITION OF APPROVAL FOR ALTERNATE FORM OF WATER HEATER TEMPORATURGE & PRESSURE ROLLER WITH PROPER INSTALLATION 3)EXTEND VENT FROM WATER HEATER & FURANCE 3' ABOVE TOP OF COOLER. |
|
| 04/14/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection 0000*/ 94 UPC SEC. 1211.3 - 1) NO GAS PIPING TO BE INSTALLED UNDER A BLDG OR STRUCTURE. 2) PLEASE PROVIDE BEFORE UNION OF BLDG SHUT OFF OR PROVIDE RIGHT/LEFT NIPPLE AND COUPLING. |