Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2003 | PLUMBING - FINAL | Not ready for Inspection | 1ST CALL 8:04 DAVID COULD NOT MAKE IT. #1. CODE VIOLATION. ON GAS LINE TO WATER HEATER ONLY A.) GAS LINE BENT. B.) GAS LINE NOT ANCHOR OF PROPELY C.) FLASHING USED NOT TO CODE OR LISTED FOR THAT USE. WE WILL NEED APPROVED LISTED FLASHING FOR ROOF PENATRATIONS. 2.) CODE VIOLATIONS ON WATER HEATER VENTS RELIEF LINE ECT. I SUGGEST THAT YOU TALK WITH A PLUMBING CONTRACTOR WE WILL REQUIRE A TEST TO OTHER IXTURES ON JOB TEST THE COMPLETE SYSTEM OR REMOVE FIXTURES & PIPE. |