Inspection History Details
Inspection Status: Approved
Inspection History: SIGN SHOP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2003 | SIGN SHOP | Approved | ||
| 04/04/2003 | SIGN SHOP | Partial Approval | IVRS - Inspection 0000*NEON ON RACEWAY GTO MUST BE 1 1/2" FROM METAL PARTS. I WILL CHECK @ ELEC. FINAL. |