Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T03EL01506

Parcel: 10711153A


Addresses:

3020 N ORACLE RD

Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Date Description Inspector Results Comments
07/31/2003 ELECTRIC - FINAL Approved IVRS - Inspection 0000*SENT TO TEP ON 08/01AM
07/30/2003 ELECTRIC - FINAL Denied 1) PER NEC ART 250-24. THE GROUNDING ELECTRODE CONDUCTOR MUST BE CONNECTED TO THE GROUNDED SERVICE CONDUCTOR (NEUTRAL) AT THE SERVICE DISCONNECTING MEANS. CHANGE THE GROUNDING CONDUCTOR FROM THE SUB PANEL TO THE MAIN DISCONNECT GROUND BAR. INSTALL THE BONDING SCREW. SEPARATE NEUTRALS AND GROUNDS AT SUB PANEL 2) BOND BUSHING IS NEEDED ON CONNECTOR FROM METER CAN TO MAIN DISCONNECT. THIS CONNECTION REQUIRES A SEALING LOCKNUT OR MYERS HUB 3) CORRECT AND RECALL