Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2003 | ELECTRIC - FINAL | Approved | PROPANE TANK INSTALLATION. | |
| 03/28/2003 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection 0000* 1.) LABLE EPO SIGN AS PER PLAN. 2.) LABEL CIRCUIT IN PANEL LPG TANK PUMP. 3.) IDENTIFY CIRCUIT AT POLE BASE TO TELL APART FROM POLE BASE CIRCUIT IN HAND HOLE 4.) ANCHOR ENCOSURE FOR LPG PUMP. 5.) COVER TRENCH PERMANENTLY. |