Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2003 | ELECTRIC - SERVICE UPGRADE | Approved | IVRS - Inspection 0000* | |
| 02/05/2003 | ELECTRIC - SERVICE UPGRADE | Partial Approval | IVRS - Inspection 0000* 1.) REMOVE THE CHASE NIPPLE FROM THE LB. USE A CLOSED SHORT THREADED NIPPLE AND LOCKNUTS. IT HAS BEEN FOUND THE THE TAPED SHOULDER OF THE CHASE NIPPLE DOES NOT. PROVIDE A "POSITION" GROUNDING CONNECTION FO RTHE CONDUIT. 2.) EXPOSE THE GROUND ROD ENDS FOR INSPECTION. 3.) ONLY ONE RUN OF GROUND WIRE IS NEEDED. YOU MAY CONNECT GROUND FROM ONE PANEL TO THE OTHER. 4.) LEAVE A SHORT SAMPLE OF THE SERVICE RISER CABLE. I NEED TO CONFIRM SIZE, AMPERAGE, AND INSULATION (MUST BE SUN LIGHT RESISTANT.) |