Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T03DV00804

Parcel: 119211460


Addresses:

1605 W CIRCLE B DR


Inspection Status: Correction Required

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Case Number - T03DV00804

Inspection Description - INSP - FOLLOW UP CODE ENFORCE

Inspection Status - Correction Required

Date Description Inspector Results Comments
01/20/2004 INSP - FOLLOW UP CODE ENFORCE Correction Required SOME VIOLATION REMAINS
MET WITH OWNER FOR FOLLOW UP INSPECTION AS REQUESTED BY OWNER. G.F.I.C.RECEPTACLES HAVE BEEN INSTALLED, TESTED & WORKING. TESTED ALL RECEPTACLES IN LIVING ROOM & BEDROOMS. ALL 3 PRONG RECEPTACLES TESTED SHOWED OPEN GROUND. OWNER CONTACTED ELECTRICAL CONTRACTOR & WILL HAVE OUT LETS CHANGED WITH IN NEXT COUPLE OF DAYS. OWNER WILL CONTACT INSP. TO RESCHEDULE FOR COMPLAINCE. DO 30 DAY FOLLOW UP.
01/12/2004 INSP - FOLLOW UP CODE ENFORCE Correction Required MET OWNER & CONTRACTOR
VISITED SITE, MET WITH OWNER & ELECTRICAL CONTRACTOR. TENANT NOT AT HOME & CHANGED ENTRY LOCKS. COULD NOT ENTER UNIT. DID INSP. OF EXTERIOR VIOLATION.
(1) ILLEGALLY INSTALLED GAS LINE FOR DRYER HAS BEEN REMOVED.
(2) ILLEGALLY INSTALLED ELECTRICAL CIRCUITS ON EXTERIOR HAVE BEEN REMOVED.
(3) COMBO PERMIT T03CM05902 FOR ELECTRICAL UP-GRADE, INSTALLATION OF HOT WATER HEATER, TRP VALVE, AGA APPROVED GAS VALVES, AND PRESSURE TEST FOR GAS LINE HAS BEEN ISSUED
(4) ALL EXPOSED ELECTRICAL CONDUCTORS HAVE BEEN INSTALLED IN CONDUIT, KNOCK-OUTS MISSING FROM SERVICE DISCONNECT PANEL HAVE BEEN REPLACED.
(5) 2 NEW EXTERIOR LIGHT FIXTURE HAVE BEEN INSTALLED BY POARCH AREA.
OWNER WILL MAKE ARRANGEMENT WITH TENANTS TO GAIN ENTRY FOR COMPLETION OF INSPECTION AND CONTACT INSPECTOR TO RESCHEDULE.
12/31/2003 INSP - FOLLOW UP CODE ENFORCE Violation VISITED SITE MET FOR SCHEDULED MEETING WITH OWNER AND CONTRACTOR (ELECTRICAL). WENT OVER VIOLATIONS, OWNER HAS REMOVED GAS PIPING IN VIOLATION FOR GAS DRYER. OWENR IN PROCESS OF APPLYING FOR COMBE PERMIT FOR PLUMBING AND ELECTRICAL ISSUES. ELECTRICAL CONTRACTOR WILL INSTALL G.F.I.C. CIRCUITS IN KITCHEN AND BATHROOM REMOVE ALL NON GROUNDED RECEPTACLES THROUGHOUT STUCTURES REMOVE (2) ILLEGAL CIRCUITS IN CARPORT AREA AND INSTALL NEW. PERMITTED CIRCUIT FOR EXTERIOR LIGHTING. PLUMBING CONTRACT WILL REMOVE NON-APPROVED GAS VALVES FOR HOT WATER HEATER AND INSTALL AGA APPROVE VALVES EASL FLUE PIPE CONNECTION AND INSTALL COPPER DRAIN LINE FOR TPR VALVE. ALSO WILL BE COVERED UNDER COMBO PERMIT FOLLOW UP INSPECTION IS SCHEDULED FOR JAN 18TH. ALL VIOLATION TO BE ABATED BY THEN. MAGNET ELECTRIC, RENE SALAZAR INFO UNDER PEOPLE.
12/11/2003 INSP - FOLLOW UP CODE ENFORCE Approved RESEARCH COMPLETED
RESEARCH DONE AT D.S.D. RECORDS DEPT. SHOWS NO PERMITS WERE FOUND IN MICRO FISH OR HARD COVER FOLDER FOR ELECTRICAL UP-GRADE, ADDITIONS OF ELECTRICAL CIRCUITS, INSTALLATION OF 30 GALLON HOT WATER HEATER, ALTERATIONS AND ADDITIONS OF GAS PIPING FOR DRYER. WILL ISSUE N.O.V. AND ALLOW 30 DAYS TO ABATE VIOLATION.