| 08/19/2003 |
INSP - FOLLOW UP CODE ENFORCE |
|
Closed |
THE COMPLEX IS IN COMPLIANCE AT THIS TIME. EVERYTHING HAS BEEN ABATED.7, 8, 10, 15, 19, AND 20 WERE VACANT AT THE TIME BUT NEED TO BE REINSPECTED BEFORE THEY ARE OCCUPIED. CLOSE CASE AT THIS TIME. |
| 08/11/2003 |
INSP - FOLLOW UP CODE ENFORCE |
|
Not ready for Inspection |
I MET MANAGER AT SITE, SAYCO THERE WORKING ON CHILLER SYSTEM, UNIT IS AT 50% SPEED WILL BE UP TO NORMAL IN ONE DAY...FOLLOW-UP WED.UNITS ARE AT 80-85 DEGREE'S AT THIS TIME. |
| 08/05/2003 |
INSP - FOLLOW UP CODE ENFORCE |
|
Correction Required |
A REINSPECTION WAS CONDUCTED TODAY BY GLENN AND ROB. 90% OF THE VIOLATIONS ARE ABATED. UNITS 1,8,11, 25, 30, AND 33 WERE NOT INSPECTED DUE TO THE TENANTS NOT PRESENT. ALL VIOLATIONS IN THE UNITS THAT WE DID INSPECT WERE ABATED. UNITS 3, 12, 14, 14, 16, 32, WERE VACANT AT THE TIME BUT WERE INSPECTED TODAY AS PART OF THE ORDER PART OF THE NOTICE. NO VIOLATIONS WERE FOUND IN ANY OF THESE UNITS. AN EXTENSION WAS GIVEN. THE OWNER WILL LINE UP AN INSPECTION WITH THE REMAINING UNITS ON MONDAY, 8/18/03 AT 10:00A.M. |
| 07/24/2003 |
INSP - FOLLOW UP CODE ENFORCE |
|
Correction Required |
SPOKE WITH OWNERS TODAY AND THEY WANT THEIR REINSPECTION ON 8/5/03.MOST ALL OF THE VIOLATIONS ARE ABATED THEY STATED. THEY ALSO FAXED A LETTER STATING THAT THEY HAVE CONTRACTED DSR TERMITE AND PEST CONTROL TO DO ALL THE UNITS AND MAINTAIN THEM REGULARLY. |
| 07/10/2003 |
INSP - FOLLOW UP CODE ENFORCE |
|
Correction Required |
AN ADDENDUM TO THE ORIGINAL NOTICE WAS PREPARED. THE NOTICE WILL BE SENT OUT TODAY AND POSTED ON THE PROPERTY ON 7/11/03. |
| 07/01/2003 |
INSP - FOLLOW UP CODE ENFORCE |
|
Correction Required |
ALL UNITS ARE NOW INSPECTED. NOTICE WILL GO OUT THIS WEEK. |
| 06/19/2003 |
INSP - FOLLOW UP CODE ENFORCE |
|
Correction Required |
UNITS #11, 16, 17, 21, 23, 25 WERE ALL THAT NEEDED TO BE INSPECTED. #11 WAS INSPECTED ON 6/16/03. UNITS #23 AND #25 WERE INSPECTED ON 6/19/03. UNIT 23 WAS RECENTLY REMODELED WITH NEW PAINT EVERY WHERE AND NEW 12" CERAMIC TILE THROUGHOUT THE UNIT. #21 IS SCHEDULED FOR FRIDAY. #16 AND #17 ARE THE ONLY UNITS LEFT. |
| 06/16/2003 |
INSP - FOLLOW UP CODE ENFORCE |
|
Correction Required |
MET OWNER ON SITE AT 7:00 A.M. ON 6/13/03. GLENN FROM FIRE AND JESS MET ME THERE AT 8:00 A.M.. OUT OF 33 UNITS, WE WERE ABLE TO INSPECT 21 UNITS. 6 UNITS WERE VACANT AND SECURED BUT THE OWNER ASKED US TO INSPECT THEM ANYWAY. THE OTHER 6 UNITS THE TENANTS WERE NOT HOME SO WE POSTED THE UNITS MAKING THE TENANT AWARE THAT WE WANTED TO INSPECT THE UNITS. TWO OF THESE TENANTS HAVE ALREDAY CALLED IN AND SET UP AN APPOINTMENT TO INSPECT. OF THE UNITS WE INSPECTED WE FOUND VERY FEW VIOLATIONS. SOME OF THE UNITS FIRE AND DNR AND DID NOT FIND ANY VIOLATIONS. THE REMAINING UNITS SHOULD BE INSPECTED THIS WEEK AND AN ADDENDUM TO THE ORIGINAL NOTICE SHOULD GO OUT THE WEEK OF THE 23RD, JUNE, 2003. |
| 06/09/2003 |
INSP - FOLLOW UP CODE ENFORCE |
|
Closed |
COMPLEX WAS INSPECTED BY FIRE AND DNR FOR COMPLIANCE TO A NOTICE AND ORDER DATED 1/11/03. WE FOUND THAT EVERYTHING ON THE NOTICE HAD BEEN ADDRESSED. AN ADDENDUM TO THE NOTICE WILL NEED TO GO OUT. CECI HAS NOW DIRECTED ME TO GO THROUGH ALL THE UNITS. I WILL SCHEDULE AN INSPECTION DATE WITH FIRE AND THE OWNERS AND MANAGER FOR NEXT WEEK. |
| 06/05/2003 |
INSP - FOLLOW UP CODE ENFORCE |
|
Not ready for Inspection |
AFTER CHECKING MY NOTEBOOK, I FOUND THAT RICK, CECI, AND I WERE OUT TO THE SITE ON 1/24/03 AT UNIT #20. CECI DIRECTED ME TO WRITE A NOTICE AND POST IT OR HAND DELIVER IT. THE UNIT WAS POSTED AND I TALKED TO THE OWNERS ON SITE ABOUT IT. THEY WERE GIVEN 24 HOURS TO FIX A MAJOR WATER LEAK THAT WAS DEPLEATING THE BOILER SYSTEMS WATER SUPPLY AND LEAVING OTHER TENANTS WITHOUT HOT WATER. I RETURNED 0N 1/27/03 WITH THE FIRE INSPECTOR TO DO THE REINSPECTION AND THE VIOLATIONS WERE ABATED INCLUDING THE POOL.(PATIO POOLS WERE ON SITE REPLACING OTHER PARTS AS WELL). MY NOTES ALSO SHOWED I WAS OUT THERE ON 2/28/03 TO CHECK PROGRESS ON A SABER NOTICE AND ANSWER QUESTIONS FOR THE OWNER. ON APRIL 10TH, I WAS OUT THERE AGAIN TO SEE WHAT WAS BEING ACCOMPLISHED.I FOUND THE NEW OWNERS TO BE VERY BUSY BRINGING THE UNITS UP TO CODE. THE NEXT INSPECTION DATE ACCORDING TO THE SABER SHEET WAS 5/5/03, WHICH WAS MOVED UP TO 5/16/03. THAT WAS RESCHEDULED UNTIL 6/3/03. VERY SIGNIFICANT PROGRESS WAS MADE COMPARED TO WHAT IT LOOKED LIKE IN JANUARY. |
| 06/05/2003 |
INSP - FOLLOW UP CODE ENFORCE |
|
Correction Required |
RECEIVED PAPERWORK FROM THE OWNERS TODAY SHOWING WHAT WAS DONE AND WHO DONE THE WORK TO UNIT #20 AFTER I WROTE THEM A NOTICE ON THE 24TH OF JANUARY, 2003. THEY ALSO SENT IN PAPERWORK SHOWING WHAT HAS BEEN DONE SINCE JANUARY, 2003 AND WHAT CONTRATORS WERE INVOLVED IN THE REFURBISHING OF THE COMPLEX. THE PAPERWORK IS IN THE SABER FILE. |
| 06/01/2003 |
INSP - FOLLOW UP CODE ENFORCE |
|
Correction Required |
REINSPECT ON 6/03/03. |