Inspection Status: Approved
Inspection History: SHEET ROCK NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 03/09/2004 |
SHEET ROCK NAILING |
|
Approved |
IVRS - Inspection 0000* |
| 03/03/2004 |
SHEET ROCK NAILING |
|
Denied |
IVRS - Inspection 0999*/ 1) PER GYPSUM ASSOCIATION TEST AS REPORTED IN GA 292-96 SHEAR VALVES FOR DRYWALL 48" WIDE INSTALLED PERPENDICTULAR TO STUDS IS 15 PERCENT WEAKER THAN 4 X 8 PANELS INSTALLED PARALLEL TO STUDS. PRESENTLY NEW WEST DRYWALL IS INSTALLING SHORT (43") PANELS 34" WIDE AND 5" PANELS RIPPERS AT TOP PLATES. ONE SHEAR WALL 8'-3/4" HIGH WILL HAVE THREE PANELS OF 48-43 AND 5'-1/2" TO COVER VERTICAL SHEAR. HAVE ENGINEER OF RECORD PROVIDE SPECIFIC DRYWALL SHEAR PANEL. INSTALLATION INSTRUCTIONS FOR ALL DRYWALL NOT INSTALLED VERTICALLY. NEW INSTRUCTIONS MUST BE APPROVEDF BY CITY OF TUCSON |