Permit: T03CM05744

Parcel: 130020360

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
01/14/2004 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection 0000*
01/13/2004 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection 0999*/1) WRAP ALL PLUMBING PIPING THAT WILL BE IN CONTACT WITH CONCRETE 2) MAKE OUT FTG. ALL LOOSE DIRT 3) MAINTAIN MINIMUM 3" CLEARANCE REBAR TO DIRT 4) NO PLAN/PERMIT VISIBLE
01/12/2004 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection 0999*/1) REINFORCING STEEL CANNOT BE IN DIRECT CONTACT WITH SOIL-INSULATE VERTICAL STEEL FROM HORIZONTAL STEEL WITH PLASTIC INSULATION TAPE 2) ALL ABS PLASTIC PLUMBING THAT WILL CONTACT CONCRETE MUST BE WRAPED WITH APPROVED INSULATION CLOSET WRAP PLASTIC