Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 01/14/2004 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
IVRS - Inspection 0000* |
| 01/13/2004 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0999*/1) WRAP ALL PLUMBING PIPING THAT WILL BE IN CONTACT WITH CONCRETE 2) MAKE OUT FTG. ALL LOOSE DIRT 3) MAINTAIN MINIMUM 3" CLEARANCE REBAR TO DIRT 4) NO PLAN/PERMIT VISIBLE |
| 01/12/2004 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0999*/1) REINFORCING STEEL CANNOT BE IN DIRECT CONTACT WITH SOIL-INSULATE VERTICAL STEEL FROM HORIZONTAL STEEL WITH PLASTIC INSULATION TAPE 2) ALL ABS PLASTIC PLUMBING THAT WILL CONTACT CONCRETE MUST BE WRAPED WITH APPROVED INSULATION CLOSET WRAP PLASTIC |