Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2004 | FRAMING | Approved | IVRS - Inspection :* | |
| 07/21/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) FRAMING WILL BE APPROVED WHEN ELECTRIC MEETS CODE |
|
| 06/25/2004 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
| 06/24/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) ELECTRIC SUB-PANEL MUST HAVE IT'S OWN GROUND SEPERATE FROM MAIN PANEL 2) USE VENT TEE AT 2" VENT INTERSECTION OR CONNECT WITH SAN-TEE VERTICAL WITH SEEP UP 3) DWV SYSTEM MUST BE WATER TESTED TO TOP 4) NAIL PROTECT ALL FRAMING PENETRATIONS < 1 1/4" FROM FACE |
|
| 05/14/2004 | FRAMING | Not ready for Inspection | IVRS - Inspection :*/ 1) COMPLETE ALL TRADES PRIOR TO FRAME INSPECTION 2) ISOLATE BATH CIRCUIT 3) GROUND SUB PANEL 4) PROTECT PVC PIPE BY ELECTRIC PANEL | |
| 04/15/2004 | FRAMING | Not ready for Inspection | IVRS - Inspection 0000*/ 1) COMPLETE ALL TRADES PRIOR TO FRAME INSPECTION | |
| 04/13/2004 | FRAMING | Not ready for Inspection | IVRS - Inspection 0000* |