Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T03CM05676

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T03CM05676

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
07/15/2005 ENGINEERING - FINAL Approved
01/14/2005 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED.
01/13/2005 ENGINEERING - FINAL Denied SITE NOT READY FOR TEMPORARY C OF O. TOO MUCH WORK IN THE PARKING LOT REMAINS UNFINISHED. THIS PRESENTS A UNSAFE CONDITION FOR A TEMPORARY C OF O TO BE ISSUED. A MEETING HAS BEEN SCHEDULED FOR FRIDAY THE 14TH WITH THE DEVELOPER TO DISCUSS WHAT CHANGES WOULD RECTIFY THE UNSAFE CONDITIONS TO BE ABLE TO MEET THE REQUIREMENTS FOR A TEMPORARY C OF O.