Permit: T03CM05674

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T03CM05674

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
07/15/2005 ENGINEERING - FINAL Approved
02/28/2005 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED.
1) PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T03BU02830 IS COMPLETED AND APPROVED.
2) PROVIDE TEMPORARY BARRICADE AT PATIO'S ON THE EAST SIDE OF BLDG. #3.
3) VERIFY THAT ALL SEWER AND STORM DRAIN CLEANOUTS ARE FLUSH WITH SIDEWALK SURFACES.
02/24/2005 ENGINEERING - FINAL Denied 1. PROVIDE BARRICADE RAILING ON THE EAST SIDE OF BUILDING 3.
2. PROVIDE SIDEWALK ACCESS BETWEEN BUILDINGS 3 & 4 TO NORRIS STREET.
3. REMOVE ROCKS AND SOIL FROM STORMWATER CATCH BASIN WEST OF BUILDING 3.