Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
Permit Number - T03CM05672
Inspection Description - ELECTRIC - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/30/2005 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
12/20/2004 | ELECTRIC - INTERMEDIATE | Partial Approval | 1) ADDRESSING HAS TO BE CORRECTED BEFORE CLEARANCE 2) PAN FOR EM OVERFLOW LINES HAS TO BE 6' ABOVE GEAR 3) CLEARANCE SUBJECT TO CORRECT ADDRESSING ON PERMIT |
|
09/14/2004 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
09/07/2004 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) STAIR WELL WALLS AND LANDINGS #2 (EXCEPT 3RD FLOOR #1 (COMPLETED) 2) STAIRWELL CEILINGS-INFO ABOVE APPLIES | |
07/21/2004 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
07/14/2004 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) DRIVEWAY LINES TO HAVE CONCRETE OVER PRIOR TO COVER 2) PRAKING LOT SOUTH AND WEST LINES 3) OPEN SERVICE FOR INSPECTION HAVE PLANS, STRUCTURE OPEN SOUTH SIDE GEAR NEMA I, IT IS REQUIRED TO BE ENCLOSED, BOND FOR TEMP SERVICE REQUIRED, LETTER ON SERVICE TORQUE REQUIRED 4) LETTER ON TORQUE, OPEN ALL GEAR 5) PLANS FOR INSPECTION 6) GEAR NEEDS ENCLOSURE-NOT ? 3 7) BOND FOR TEMP POWER |