Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2005 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 12/29/2004 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) EXPOSE FOOTERS |
|
| 12/20/2004 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 02/05/2004 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection 0999*/ 1) RAFTERS ON EAST END CANNOT BE HUNG FROM 1 X FREEZE BOARDS. MUST BEAR ON STRUCTURE 2) H2.5 CLIPS ON WEST END OF RAFTERS MUST BE ON ALL RAFTERS AND ALL HOLES FILLED WITH NAILS 3) EXPOSE POST FOOTINGS TO A DEPTH OF 12" TO VERIFY FOOTING SIZE 4) NORTH POST MUST BE BOLTED TO DOUBLE 2 X 6 BEAM 5) ROOF SHEATHING MUST BE NAILED TO ALL RAFTERS 6) ONE RAFTER MISSING BY WATER HEATER |