Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T03CM05561
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2007 | ENGINEERING - FINAL | Approved | ALL PERMITS HAVE BEEN FINALED OUT FOR ENGINEERING | |
| 01/22/2007 | ENGINEERING - FINAL | Approved | ALL PREVIOUS COMMENTS THAT REFLECTED GRADING ISSUES WILL BE HELD TO THE GRADING PERMIT FOR THIS SITE. | |
| 05/31/2006 | ENGINEERING - FINAL | Partial Approval | MET WITH DOUG WITH TL ROOF ON SITE DISCUSSED SOME CONCERNS SEE T03BU03084 FOR PRELIMINARY PUNCH LIST FOR ENTIRE SITE COMMENTS FROM 9/19/05 MEET WITH DAVE ROBERTS: ADDRESSED 1) REPAIR THE EROSION THAT HAS BEEN CAUSED BY THE ROOF DRAINAGE OUTLET AT THE NORTHEAST CORNER OF THE BUILDING. THIS WILL REQUIRE THE PLACEMENT OF ADDITIONAL MATERIAL BETWEEN THE OUTLET AND THE ADJACENT PARKING LOT. OUTSTANDING 2) PROVIDE EROSION PROTECTION IN THE DETENTION RETENTION BASIN AT ALL INLETS. THIS WILL INCLUDE THE FARTHEST EASTERN ENTRANCE AT THE NORTHEAST CORNER OF THE SITE AS WELL AS ALL ENTRANCES INTO THE BASIN FROM THE PARKING STRUCTURES. ADDRESSED 3) REPAIR ALL EROSION AT THE ENTRANCES OFF OF HOUGHTON INTO THIS SITE, AND WITHIN THE RIGHT-OF-WAY ALONG HOUGHTON ROAD. THE CONTRACTOR WILL TRY TO ARRANGE A MEETING WITH THE PROPERTY OWNER, MANAGER AND HIMSELF TO DISCUSS THE WORK THAT IS STILL NEEDED ON THIS SITE PRIOR TO THE FINAL RELEASE OF THE C OF O. |
|
| 09/20/2005 | ENGINEERING - FINAL | Partial Approval | MET WITH THE OWNER, MANAGEMENT FIRM, AND THE CONTRACTOR TO DISCUSS THE REMAINING WORK ON THIS SITE. THEY WILL TRY TO COMPLETE THE WORK FOR THIS AREA WITHIN THE NEXT TWO WEEKS, A RE-INSPECTION FOR THE SITE WILL BE SCHEDULED ONCE ALL OF THE WORK IS COMPLETE. I ADVISED THE CREW THAT I WILL TRY TO VISIT THE SITE DURING THAT TIME FRAME TO SEE HOW THE WORK IS PROGRESSING. | |
| 09/19/2005 | ENGINEERING - FINAL | Partial Approval | MET WITH TL ROOF ON-SITE AND DISCUSSED SOME OF THE ON-GOING PROBLEMS WITH THIS SITE. THE FOLLOOWING ITEMS WILL NEED TO BE COMPLETED PRIOR TO REQUESTING A FINAL C OF O FOR THE FRY'S STORE. 1) REPAIR THE EROSION THAT HAS BEEN CAUSED BY THE ROOF DRAINAGE OUTLET AT THE NORTHEAST CORNER OF THE BUILDING. THIS WILL REQUIRE THE PLACEMENT OF ADDITIONAL MATERIAL BETWEEN THE OUTLET AND THE ADJACENT PARKING LOT. 2) PROVIDE EROSION PROTECTION IN THE DETENTION RETENTION BASIN AT ALL INLETS. THIS WILL INCLUDE THE FARTHEST EASTERN ENTRANCE AT THE NORTHEAST CORNER OF THE SITE AS WELL AS ALL ENTRANCES INTO THE BASIN FROM THE PARKING STRUCTURES. 3) REPAIR ALL EROSION AT THE ENTRANCES OFF OF HOUGHTON INTO THIS SITE, AND WITHIN THE RIGHT-OF-WAY ALONG HOUGHTON ROAD. THE CONTRACTOR WILL TRY TO ARRANGE A MEETING WITH THE PROPERTY OWNER, MANAGER AND HIMSELF TO DISCUSS THE WORK THAT IS STILL NEEDED ON THIS SITE PRIOR TO THE FINAL RELEASE OF THE C OF O. |
|
| 05/27/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. |