Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 05/18/2005 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* |
| 04/26/2005 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection :* 60 PSI 3" WELDED GAS PIPING FROM METER TO ALL APPLIANCES THAT ARE VALVED OFF PER PLAN( APPROVED PARTIAL) 10 PSI TEST REQUIRED FOR HANGING DUCT HEATER & UTENSIL WASHER. |
| 02/15/2005 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection :* PARTIAL APPROVAL 2" GAS FROM 10' FROM FINISH FLOOR CENTER NORTH TO 1 1/2 TO OVEN AND 3/4" TO UTENSIL WASHER 60 PSI AIR TEST OK. 1) NEED REVISED GAS ISOMETRIC FOR DELETION OF WATER HEATER GAS PIPING |