Inspection Status: Approved
Inspection History: PLUMBING - ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 05/11/2005 |
PLUMBING - ABOVE CEILING |
|
Approved |
IVRS - Inspection :* |
| 02/28/2005 |
PLUMBING - ABOVE CEILING |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 02/10/2005 |
PLUMBING - ABOVE CEILING |
|
Partial Approval |
IVRS - Inspection :*1) PLEASE POST YOUR ADDRESS. 2) PLEASE LIST THE CORRECT GENERAL CONTRACTOR ON THE PERMIT. AS INDICATED ABOVE SUMMIT BLDRS IS THE GC ON THIS PROJECT. 3) SINK UNDER MEZZANINE BLOCKED OUT-STUBBED OUTSIDE UNDERGROUND UNDER CONCRETE. 4) OVERHEAD PAINTED BEFORE INSPECTION. 5) NO PROVISION FOR INSULATION ON HOT WATER PIPING SPEC. BOOK CALLS FOR HANGERS. 6) EAST SIDE ABS DWV THRU ROOF OK. WATER TEST OK. OK TO DROP TEST THSI AREA DELI PRODUCE PREP DINING BREAK ROOM PREP. 7) OK TO INSULATE THESE AREAS |