Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - PROGRESS
Permit Number - T03CM05561
Inspection Description - ELECTRIC - PROGRESS
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2007 | ELECTRIC - PROGRESS | Approved | ||
| 06/03/2005 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* FOR TEMP C OF O CALL IN UNDER 2090. 1. EMERGENCY GENERATOR TEST RESULTS & INSPECTION OF EQUIPMENT AND INSPECTION OF GENERATOR RUNNING ALL EMERGENCY LIGHTING. 2. ALL ELECTRICAL SWITCH GEAR AND PANELS TO HAVE ALL LABELING & ID REQUIREMENTS PLUS PANEL SCHEDULES. 3. ALL PANELS TO BE CLOSED & COVERS PUT ON. 4. ALL LOW VOLTAGE CABLING 2ND FLOOR BY PHARMACY TO BE SUPPORTED OFF T-BAR CEILING. 5. INSPECT SOFFIT AREAS-MAKE SURE ALL J-BOXES MADE UP. 6. FINISH J-BOXES ABOVE SEAFOOF FREEZERS. 7. FINISH WIRING BAND SAWS MEAT SECTION. 8. CLOSE UP ALL OPEN J-BOXES. 9. ROOF DONE? | |
| 05/25/2005 | ELECTRIC - PROGRESS | Partial Approval | 1) APPROVED FOR TEMP C OF O FOR STOCKING ONLY 2) A/C UNITS PHARMACH OK-SEAL 3/4" HOLES AND TIGHTEN FLEX 3) PANEL EL OK 4) INSTALL GROUND FLOOR BOX OVER PARKING LOT CONDUCTORS 5) J-BOXES FOR SIGNS NOT FINISHED 6) SOFFIT WIRING NOT FINISHED 7) ROOF WIRING NOT FINISHED |
|
| 05/24/2005 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* / 1) 1ST AND 2ND MEZZ, BATHROOMS, OK TO COVER CEILINGS. 2) PANELS EH, LB, LA - CONTRACTOR EH & LA OK, CONTRACTOR LB OK. 3) TRANS SW EL - DISCON - EL TRANS - PNL EL. 4) PNL EL NEEDS MCB FROM TRANS, 5) PARKING LOT POLES OK. PNLS PD1 & PD2 OK. 6) PANELS P3, P3A, P4 OK | |
| 05/23/2005 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) REFRIDGERATOR CASES ON FLOOR-OK 2) WALK IN FREEZERS AND COOLERS-OK 3) AH #1 PROVIDE CLEARANCE FOR 60A DISCONNECT AND CONTROL PANEL REQUIRES ACCESS PLATFORM 4) AH #2 DISCONNECT NUT AND BOLT GRD LUG-THEN OK 5) RACK HOUSE OK-2 600 AMP MAIN DISCONNECTS OK 6) PANELS CPA, CPB, CPC, CLA OK TO ENERGIZE 7) PHARMACY AH OK-OFFICE AN DISCONNECTS-OK 8) SERVICE DELI AND PRODUCE CASES OK 9) SEAL ALL CONDUIT ENTRANCES TO FREEZERS AND WALK-INS 10) OK ON LETTER PER ENG-OMITTING MAINS FOR RACK HOUSE SERVICE PANELS 11) OK ON CHANGE OF LOCATION AND VOLTAGE OF ? 3-4-5 FROM HDPA TO PANEL P2 |
|
| 05/10/2005 | ELECTRIC - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEED BOND POSTED FOR TEMP POWER. 2. LETTER ON TORQUE FROM ELECT CONTRACTOR. 3. VERIFY UFER WATER & STEEL & SPRINKLER BONDS OK, NEED GAS. 4. OBTAIN ENG LETTER ON CHANGE FROM ALUM TO COPPER AND NEW FAULT CURRENT SCHUDULE. 5. 500 KUA TRANSFORMER REQUIRES 2 GROUND RODS-ONLY ONE INSTALLED 6. DISTANCE BETWEEN 500 KUA TRANS AND TEM 75 KVA NEEDS TO BE 4' PER NEC 2002 126. 7. MAIN SW GEAR PROTECT ALL CONDUCTORS. 8. FIX BUSHINGS HPDB PANEL. DUE TO TIME PLEASE CALL IN FOR WED INSP. |
|
| 05/02/2005 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) MDP2 PANEL REQUIRES 600/3 MCB PER PLAN. 2) RACK AC IN MDP2 MUST BE REVISED BY ENGINEER FOR 175 AMP INSTEAD OF 500A SHOWN. |