Permit: T03CM05561

Parcel: 11415008V


Addresses:

8080 S HOUGHTON RD


Inspection Status: Approved

Inspection History: ELECTRIC - UNDERGROUND

Permit Number - T03CM05561

Inspection Description - ELECTRIC - UNDERGROUND

Inspection Status - Approved

Date Description Inspector Results Comments
03/14/2007 ELECTRIC - UNDERGROUND Approved
02/28/2005 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :* OK NORTH 1/2 SLAB OK RESCHEDULE SOUTH 1/2 INSP. PRIOR TO POUR
01/19/2005 ELECTRIC - UNDERGROUND Not ready for Inspection IVRS - Inspection :*
01/12/2005 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :* PARTIAL
01/11/2005 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :* PARTIAL NORTH BRANCH CIRCUITS
01/10/2005 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*PROVIDE ME R. F. IK FROM ENGINEER REGARDING RIGID OR RIGID NON METALIC ON ALL THROUGH SLAB PENETRATION.
01/03/2005 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :* PARTIAL GEAR AREA OK U.G.
12/29/2004 ELECTRIC - UNDERGROUND Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) ELECTRICIANS WENT HOME DUE TO RAIN
12/28/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
12/22/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
1) COOLER CASES
12/21/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*PARTIAL APPROVAL-COL LINE A TO 5 REFRIDERATION CASES.
12/20/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
1) CENTER COOLER CASES
12/17/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
12/16/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*
1) EAST PORTION EXCEPT FIBER OPTIC
2) LEAVE CONDUIT OPEN FROM START OF PIPE RUN TO FINISH
12/15/2004 ELECTRIC - UNDERGROUND Not ready for Inspection IVRS - Inspection :*
1) GIVE-GET AREAS 100 PERCENT COMPLETE SO I CAN START MARKING AREAS ON PLAN AS COMPLETED
12/14/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*/FINISH EAST PROTION. MANY UNFINSHEED CONDUIT RUNS
12/12/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*/1)UNDERGROUND PARTIAL FOR REFRIGERATION CIRCUITS 2)NEED 2ND GROUND ROD 3)STRAP 2 1/2" RISER
12/08/2004 ELECTRIC - UNDERGROUND Partial Approval 1)S WEST AREA OK TO CONTINUE VARIOUS RUNS 2)SUMP PUMP STUB UP OK 3)FOR TEMP SERVICE A. DRIVE GROUND RODS & TIE TO GROUND BAR B)ADDRESS SERVICE C. INSTALL GFT BELOW SERVICE
12/03/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*/ 1) 3/4" STUB AT SUMP PUMP (OUT OF FOOTING)
2) 2 1/2" FOR FUTURE BANK
3) 6-PAV. 4" BELOW NORTH FOOTING
12/01/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*/ 1) OK CONTINUE 2 1/2 FOR FUTURE BANK. CALL FOR REMAINDER 40' WHEN READY
2) OK 1 1/2 COMM CONDUITS FROM EAST END OF BLDG TO COL. LINE 4 AND 5
11/30/2004 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection :*/ 1) COM AND SECURITY APROX 120'