Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/17/2004 |
ELECTRIC - INTERMEDIATE |
|
Approved |
IVRS - Inspection 0000* |
| 03/16/2004 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection 0000*/ WALL ROUGH IN ONLY. 1) THE NE CODE REQUIRES M/C CABLE BE STRAPED, OR TIE WIRED WITHIN 12" OF EACH BOX, FIXTURE ETC. THE M/C CABLE IN THE FRONT SOFFIT REQUIRES SUPPORT. 2) INSTALL THE CIRCUITS AND J-BOXES FOR THE SIGN CIRCUIT. DO NOT DEVIATE FROM THE ENGINEERS CIRCUIT LAYOUT. DISTRIBUTION OF CIRCUITS MUST BE PER PANEL SCHEDULE. RECALL FOR HARD CEILING INSP. PRIOR TO APPLYING DRYWALL. |