Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date |
Description |
Inspector |
Results |
Comments |
| 02/12/2004 |
REINFORCED MASONRY PRE-GROUT |
|
Approved |
IVRS - Inspection 0000* |
| 02/11/2004 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
IVRS - Inspection 0000* 1ST LIFT |
| 02/10/2004 |
REINFORCED MASONRY PRE-GROUT |
|
Denied |
IVRS - Inspection 0999*/ 1) 20" LAP REQUIRED AT VERTICALS |
| 02/09/2004 |
REINFORCED MASONRY PRE-GROUT |
|
Denied |
IVRS - Inspection 0999*/ 1) GROUTED PRIOR TO INSPECTION 2) NOTES: POOR DESIGN FOR COLUMNS 3) DESIGN SHOULD INCLUDE 4 VERTICALS AND TIES AT 24" ON CENTER |
| 02/05/2004 |
REINFORCED MASONRY PRE-GROUT |
|
Denied |
IVRS - Inspection 0999*/ 1) NO PLAN ON SITE 2) NOTE: FIRST LIFT EXCEEDS MAXIMUM ALLOWABLE HEIGHT |