Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2004 | ROOF NAILING | Approved | IVRS - Inspection :* | |
| 08/04/2004 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) MUST MAINTAIN MAXIMUM 6"-12" SPACING NAILING ROOF SHEATHING 2) MUST NAIL PA STRAPS INTO SHEATHING INTO RAFTERS (DBLE UP RAFTERS WHERE REQUIRED) 3) ROOF OVERBAY AREA NOT DONE 4) NEED CITY APPROVED TJI DRAWINGS |
|
| 07/15/2004 | ROOF NAILING | Not ready for Inspection | IVRS - Inspection :* |