Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T03CM05184
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2004 | ENGINEERING - FINAL | Approved | ||
| 09/23/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. 1. COMPLETE EROSION PROTECTION AT THE DOWN SPOUTS LOCATED ALONG THE N. SIDE OF THE BUILDING. |
|
| 05/25/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1. PROVIDE TEMPORARY BARRICADE AT 1:1 SLOPE ON EAST SIDE OF THE BUILDING OR PROVIDE 3:1 SLOPE UNTIL RETAINING WALL IS IN PLACE. 2. PROVIDE EROSION PROTECTION FOR ROOF DRAIN DOWNSPOUTS. 3. PROVIDE AN APPROVED COPY OF THE PLAN FOR INSPECTION, NEEDS TO HAVE C.O.T. ENGINEERING STAMP OF APPROVAL. |
|
| 05/10/2004 | ENGINEERING - FINAL | Denied | DENIED - NOT READY FOR INSPECTION. 1) CALL FOR RE-INSPECTION WHEN SAFE INGRESS/EGRESS TO BUILDING IS PROVIDED AND ALL OVERHEAD WORK IS COMPLETE. 2. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIALS AND DEBRIS. 3. RE-INSTALL STORMWATER CONTROLS EAST OF BUILDING. MAINTAIN CONTROLS UNTIL PERMANENT STABILIZATION HAS OCCURRED. |