Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T03CM05176

Parcel: 120070300


Addresses:

145 W AJO WY

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
05/20/2004 PLUMBING - INTERMEDIATE Approved
04/01/2004 PLUMBING - INTERMEDIATE Partial Approval 1) WASTE AND VENT SYSTEM IS OK. 2) WTR DISTRIBUTION IS OK IN PLBG WALLS ONLY. OK FOR DRYWALL. 3) THERE IS STILL ½" COPPER TOUCHING METAL STUDS OVER REFER.
03/30/2004 PLUMBING - INTERMEDIATE Denied IVRS - Inspection 0999*
03/29/2004 PLUMBING - INTERMEDIATE Denied IVRS - Inspection 0999*/ 1) CAN ONLY SERVE 2 FIXTURES ON A ½" COLD. 2) SOIL WTR TEST IS OK.
03/25/2004 PLUMBING - INTERMEDIATE Denied IVRS - Inspection 0999*/ 1) MUST PROVIDE MIN. 3" VENT THRU ROOF. VENT MUST EQUAL AGGREGATE CROSS SECTIONAL AREA OF REQUIRED BLDG. SEWER. SEE SEC 904.1, 94 UPC. 2) NO TEST ON SYSTEM. 3) LOTS OF LOOSE WTR LINES IN WALL. 4) MUST PAY RE-INSPECTION FEE PRIOR TO NEXT INSP. 5) SEE NOTE 1 FROM PREVIOUS INSP.